Cement company reaches its maximum production in 7 years with the UC3 technology
After the introduction of UC3 technology about 2 years ago a cement factory produced 82,687 tons of white cement, an amount never obtained in the last 7 years.
Cement Production
300 t clk / day
Petcoke
REALIABILITY FACTOR
+
5
%
KILN PRODUCTION
+
8
%
+500t of clinker/month
THERMAL CONSUMPTION
-
87
kcal/kg
Benefício | Unidade | Observações | |
---|---|---|---|
Reliability Factor | +5 | % | |
Kiln Production | +8 | % | +500t of clinker/month |
Thermal Consumption (SHC) | -6 | % | -87 kcal/kg |
Monthly Clinker Production
With the UC3 technology there was a reduction of process stops, which resulted in an increase of the reliability factor of the kiln and, consequently, an increase in clinker production.
In this facility, with UC3 technology operating for nine months in 2017, was set the record of clinker production of kiln in the last seven years.