Case C – Steam Production
INDUSTRIES

2-digit numbers ​​achieved in Biomass Boiler with UC3 technology

In a Biomass Boiler the ​​achieved numbers allowed to substantially reduce the costs of the steam with a considerable increase of its production.

Biomass Boiler

12.6 t steam/h

Wood Chip

STEAM PRODUCTION (t/H)

+
33 %

THERMAL STEAM CONSUMPTION (MJ/t)

-
27 %

STEAM COST (€/t)

-
28 %
Reduced running time of the fuel back-up boiler

 

Production of Bottom Ash
Without UC3

ASH Density: 145g/l
Loss of Ignition (950ºC TGA): 72,8 %

 

Production of Bottom Ash
With UC3

Densidade das Cinzas: 505 g/l
Loss of Ignition (950ºC TGA): 16,9 %